
We tailor every marketing campaign to a customer’s requirements and we have access to quality marketing tools such as professional photography, video walk-throughs, drone video footage, distinctive floorplans which brings a property to life, right off of the screen.
59 High Street offers the opportunity to acquire a property in the Speyside village of Archiestown, with a proposed two-bedroom bungalow and three existing buildings already on site.
The owner proposes a Scandinavian-style micro-home design, with a single-storey layout and contemporary finishes. A self-contained cabin, separate artist studio or home office and insulated workshop accompany the project. Archiestown lies in the heart of Speyside, close to renowned distilleries including Macallan and Cardhu. The original sales particulars describe open countryside views towards Ben Rinnes.
The owner’s proposed specification
The revised plan provides two bedrooms, including a principal bedroom with en suite, a separate bathroom and an open-plan kitchen, dining and lounge area.
Planning permission and a new building warrant have been applied for. Construction is intended to begin once both are in place, with the owner anticipating a 2027 build and completion project.
Bach Design drawings dated 17 September 2026. Illustrative extracts, reduced from the originals and not to scale.
Steel sheet cladding with timber detailing, full underfloor heating and an air source heat pump. The owner’s update specifies triple-glazed aluminium windows and doors. Final materials and specification are subject to agreement. Site area stated on the revised architect’s drawing. Extent and boundaries are subject to title confirmation.
Any gate across an accessible route should offer a clear opening width of at least 850 mm
900mm Accessible Route Accessible Entrance
Approximately 694 sq m
Site area stated on the revised architect’s drawing. Extent and boundaries are subject
to title confirmation.
PROPOSED ACCOMMODATION
Two bedrooms
Principal en suite
Separate bathroom
Kitchen / dining / lounge
Entrance hallway
Storage cupboards
The existing workshop is described separately in these particulars.
The owner confirms the pod is finished and liveable, with bedroom accommodation, a kitchen and a WC / shower. Services are working and Wi-Fi is connected.
A separate studio or home office, which the owner describes as fully finished and operational, including a
Wi-Fi connection.
A large insulated workshop with power and lighting. The owner confirms it is operational and advises that new external cladding is to be fitted.
PLANNING & BUILD PROGRAMME SERVICES & TENURE
Mains water, drainage and electricity are identified in the existing particulars. The owner confirms working services to the cabin and Wi-Fi to the cabin and studio. These have not been independently tested by CCL. The existing particulars describe the tenure as freehold, subject to confirmation of title by the purchaser’s solicitor.
Contact CCL to discuss the proposed build, final specification, completion arrangements and what is included in the sale. The owner is happy to answer questions from interested purchasers through the selling agent.
These particulars are a general guide and do not form part of any contract. A detailed survey has not been carried out, nor services, appliances or fittings tested. Photographs show the existing site and buildings. Drawings show the proposed bungalow and do not represent a completed house.
Plans are illustrative and not to scale. Areas are approximate. Purchasers should verify title, boundaries, consents, specification and all matters material to their decision. The owner’s glazing specification differs from the uPVC glazing noted on the drawings, so the final specification must be confirmed.
The owner’s update of 8 October 2026 confirms applications for new full planning permission and a
building warrant for the two-bedroom bungalow. The owner estimated 12 to 16 weeks to secure these, with building to follow and a 2027 build and completion anticipated. Timing remains subject to approvals and the construction programme.